Thursday, 31 July 2014

About the Group

 BHUSHAN POWER & STEEL LIMITED


Bhushan Power & Steel Limited (BPSL), is a fully integrated 2.8 Million TPA Steel Making Company having turnover of INR 9517 Crores (USD 1752 Million) FY13.

The Company is certified to ISO 9001:2008 & TS-16949 Quality Standards and ISO 14001:2004 Environment Management Standards.

BPSL is a leading manufacturer of flat and long products and have state-ofthe-art plants at Chandigarh, Derabassi, Kolkata and Orissa in India. These plants manufacture value added products covering entire steel value chain right from Coal Mining to manufacturing Pig Iron, DRI, Billets, HR Coils, CR Coils, GP/GC Sheets, Precision Tubes, Black Pipe/GI Pipe, Cable Tapes, Tor Steel, Carbon and Special Alloy Steel Wire Rods and Rounds conforming to IS and international standards.
The Company have successfully commissioned a 2.8 Million TPA Greenfield Steel and Power Plant in Orissa with HR Coil making facility - First in Private Sector in the State of Orissa. For this plant, technology and equipments were sourced from leading world-renowned companies viz., Lurgi, ABB Ltd., SMS Siemag, SMS Meer Danieli, LOI Tenova, Kocks etc. BPSL has a wide marketing network in both India (comprising 35 sales offices) and abroad for selling its value added product range.
The rock-solid foundation combined with continuous upgradation and innovation has enabled the Company to surpass its goals constantly. BPSL's end-to-end portfolio has enabled it to offer a wide spectrum of products at superior quality consistently surpassing customers' specifications. In addition to export thrust, BPSL cater to the domestic steel requirements of fast-growing sectors like automotive, white goods, construction / infrastructure, furniture, fasteners, telecommunication, power etc.
With a view to make its presence in a big way in Special Alloy Steel Long Product business, BPSL has commissioned a most modern state of the art Wire Rod-cum-Bar Mill and is commissioning a host of down stream finishing facilities viz., Heat Treatment facilities, Bright Bar manufacture etc.

Growing from strength to strength

1970-Started with very small initial outlay for manufacturing Door Hinges & later on, Rail Track Fasteners.
1973-Manufacturing facilities set up for Tor Steel and Wire Rod in Chandigarh.
1981-Rolling Mill Project commissioned at Chandigarh for Round and Narrow Strips.
1985-Backward Integration Project for Steel Melting facilities.
1986-Upgrading of Mini Steel Plant with continuous casting and ladle furnace facilities.
1997-Commissioning of Narrow Width Cold Rolling Project at Chandigarh.
1998-Commissioning of Precision Pipe Project at Chandigarh.
2001-Commissioning of Cold Rolling & Galvanizing Complex at Kolkata.
2002-Addition of narrow width Cold Rolling facilities at Kolkata.
2003-Expansion of wide width Cold Rolling facilities, ERW Water Pipes & Tubes down stream facilities at Kolkata.
2004-Further expansion of Cold Rolling facilities at Kolkata.
2005-Commissioning of Orissa Project Phase-I consisting of 4 DRI Kilns, Steel Making Facilities, Coal Washery and 100 MW Power Plant.
2007-Commissioning of further expansion of Orissa Project Phase-II consisting of HR Coil Mill, Steel making, Blast Furnance, Sinter plant, Coke oven plant, Oxygen plant and Lime & Calcining Plant.
2009-Commissioning of 3.5 million tpa Coal Washery, 146 MW Power Plant and 0.3 million tpa Sponge Iron under Phase III of Orissa Project.
2010-Commissioning of 130 MW Power Plant and Electric Arc Furnace under Phase III of Orissa Project and further expansion of Orissa Project under Phase IV consisting of 6 DRI Kilns, 130 MW Power Plant, Steel Making Facilities,2nd CSP Caster & 6th strand along with Tunnel Furnace, Oxygen Plant, Lime Calcining with downstream facilities - Cold Rolling, Galvanizing, Galvalume, Colour Coating, Precision Tube & Black Pipe/GI Pipe.
2011-Commissioning of DRI Kilns, Electric Arc Furnace, 2nd CSP Caster & 6th Strand alongwith Tunnel Furnace, Cold Rolling Mill Complex and Galvanising under Phase-IV of Odisha Project.
2012-Commissioning of DRI Kilns, Power Plant, Oxygen Plant, Lime Calcining Plant, Galvalume, Color Coating, Precision Tube and Pipe Plant under Odisha Phase-IV Project, and implementation of further expansion of Odisha Project under Phase V, consisting of DRI Kilns, Iron Ore Benefication Plant, Pellet Plant, Cold Rolling, Pickling Line, Precision Tube Mill, Black  Pipe Plant and Bright Bar finishing lines.
2013-Commissioning of Cold Rolling Mill, Pickling Line, Precision Tube Mill, Black Pipe Plant and Bright Bar Finishing Line Under Odisha Phase -V Project